suriamas: renovation update #2

latest update on our suriamas apartment:

dry kitchen cabinet is almost completed. the only thing left is the glass window to be installed. the table top is solid surface-type, different from the table top for wet kitchen cabinet, with is made from 2x2 tiles. fridge pun dah ready.



reno for wet kitchen completed dah. ada built in stove and double sink. other than that, a special platform for washing machine.



in the living room, the contractor paint the feature wall mellon-red as promised. cun jugak laa. so far we only installed the curtain (missus yang pilih ni..) and letak the sofa that we bought at ttdi.


that's all. nanti final update when all furniture is ready...